The building consists of the basement level which houses three independent water reservoirs for the fire protection system, and the upper ground floor where the main pumps and other M&E equipment is located. RCDC was commissioned to compile the FE model for the Structural Engineer, and the RC detailing.
Project Owner:
Total Budget:
Services Provided:
.
Aegean Motorway S.A.
250k
FE modelling, RC Detailing.